
Greater Changhua 2b & 4 offshore substation installed
The offshore substation has been installed at its designated location 47 km off the southwest coast of Taiwan.
The offshore substation has been installed at its designated location 47 km off the southwest coast of Taiwan.
Ørsted has begun the offshore construction for the Greater Changhua 2b and 4 offshore wind farms in Taiwan.