
Prysmian wins Dutch grid innovation challenge
Prysmian won the “Quick & Simple Substation” challenge by Dutch grid operators Alliander, Enexis, and Stedin, outperforming 13 other contenders.
Prysmian won the “Quick & Simple Substation” challenge by Dutch grid operators Alliander, Enexis, and Stedin, outperforming 13 other contenders.
The Netherlands, Vlissingen: Kolektor Etra has announced successfully assembling two power transformers rated 150 MVA for Stedin.
Netherlands, Vlissingen – A five meter high transformer weighing 170,000 kg arrived in the port of Vlissingen on 14 February.